Skip to main content
  1. The Purpose of The Project

    1. Increase the supply of surface water, reduce groundwater extraction and land subsidence.
    2. Stabilize regional water supply, reduce the risk of water scarcity, and respond to regional development needs.
    3. “The Specific Solution and Action Project of Land Subsidence in Yunlin and Changhua County Areas.”
      1. The long-term overuse of groundwater in Changhua area is detailed in Figure 1.
      2. The land subsidence extends inland is detailed in Figure 2.
      Figure.1 Long-term overuse of groundwater in Changhua area.

      Figure.1 Long-term overuse of groundwater in Changhua area.

      Figure.2 Land subsidence extends inland.

      Figure.2 Land subsidence extends inland.

  2. The Progress of The Project

    Figure.3 The Progress of The Project

    Figure.3 The Progress of The Project

  3. The Various Elements of Engineering

    Figure.4 The Various Elements of Engineering

    Figure.4 The Various Elements of Engineering

  4. Planning stage related photos

    Photo.1 Former Director Huang of the Water Resources Department On-site guidance

    Photo.1 Former Director Huang of the Water Resources Department On-site guidance

    Photo.2 Former Director Yang of the Water Resources Department On-site guidance

    Photo.2 Former Director Yang of the Water Resources Department On-site guidance